Routine Maintenance & Common Upgrades
| How often | Task |
|---|---|
| Every print | Wipe the plate, check the nozzle tip |
| Monthly | Check belt tension and frame screws, clean the linear rails |
| Every few months | Re-run input shaping, check cables for wear at bending points |
Useful upgrades: a vibration-damping mat or heavy base, a spare nozzle set, and a filament dry box for PETG and TPU.